{"id":91081,"date":"2023-05-06T08:12:00","date_gmt":"2023-05-06T06:12:00","guid":{"rendered":"https:\/\/cms.munich-startup.net\/?p=91081"},"modified":"2023-08-02T11:43:27","modified_gmt":"2023-08-02T09:43:27","slug":"energyminer-commissions-pilot-plant","status":"publish","type":"post","link":"https:\/\/cms.munich-startup.net\/en\/91081\/energyminer-commissions-pilot-plant\/","title":{"rendered":"Energyminer commissions pilot plant"},"content":{"rendered":"<div class=\"entry-content\">\n<p>Energyminer&#039;s pilot plant is located in the Auer M\u00fchlbach stream at the Kraemer&#039;sche Kunstm\u00fchle in Munich. It consists of a micro-hydropower plant called &quot;Energyfish,&quot; which is almost entirely submerged and designed to pose no threat to fish. <a href=\"https:\/\/energyminer.eu\/\" target=\"_blank\" rel=\"noreferrer noopener\">hydroelectric power plant<\/a> uses the river&#039;s flow velocity to drive a rotor that generates electricity. There is no need to dam or alter the river. The river biotope remains intact and the landscape is not affected. The system operates silently and produces electricity in all weather conditions. The Energyfish is designed to operate in a swarm of up to 100 systems, supplying up to 470 households. According to the <a href=\"\/en\/startups\/energyminer-gmbh\/\">Company<\/a> In contrast to wind power or photovoltaics, it is capable of base load.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Energyminer: \u201cWe are proud to create a clean and reliable energy source\u201d<\/h2>\n\n\n\n<p>Energyminer&#039;s solution is designed to reduce investment costs by approximately 88 percent compared to comparable kinetic hydropower plants while simultaneously increasing energy yield. According to the company, the plants can be approved in just a few months and installed within a few hours.<\/p>\n\n\n\n<p>Energyminer was founded in 2021 by Chantel Niebuhr, Georg Walder and Richard Eckl. <strong>George Walder<\/strong> says:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&quot;The Energyfish is a breakthrough in hydropower technology and an important step toward the success of the energy transition. We are proud to create a clean and reliable energy source that protects the environment and supplies energy to communities and neighborhoods.&quot;<\/p><\/blockquote>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Energyminer develops micro-hydropower plants that are designed to be non-invasive to the river habitat. The company has now commissioned a pilot plant in the Auer M\u00fchlbach stream in Munich.<\/p>","protected":false},"author":26,"featured_media":90033,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5638,1],"tags":[737,4619],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Energyminer nimmt Pilotanlage in Betrieb - Munich Startup<\/title>\n<meta name=\"description\" content=\"Energyminer entwickelt Mikro-Wasserkraftwerke und hat nun eine Pilotanlage im Auer M\u00fchlbach in M\u00fcnchen in Betrieb genommen.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cms.munich-startup.net\/en\/91081\/energyminer-commissions-pilot-plant\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Energyminer nimmt Pilotanlage in Betrieb - Munich Startup\" \/>\n<meta property=\"og:description\" content=\"Energyminer entwickelt Mikro-Wasserkraftwerke und hat nun eine Pilotanlage im Auer M\u00fchlbach in M\u00fcnchen in Betrieb genommen.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cms.munich-startup.net\/en\/91081\/energyminer-commissions-pilot-plant\/\" \/>\n<meta property=\"og:site_name\" content=\"Munich Startup\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/munichstartup\/\" \/>\n<meta property=\"article:published_time\" content=\"2023-05-06T06:12:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-08-02T09:43:27+00:00\" \/>\n<meta name=\"author\" content=\"Simon Tischer\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@munich_startup\" \/>\n<meta name=\"twitter:site\" content=\"@munich_startup\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Simon Tischer\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/\",\"url\":\"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/\",\"name\":\"Energyminer nimmt Pilotanlage in Betrieb - Munich Startup\",\"isPartOf\":{\"@id\":\"https:\/\/cms.munich-startup.net\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cms.munich-startup.net\/wp-content\/uploads\/2023\/03\/Energyminer_Team_Foto-by-Isenhoff_Philip-Herzhoff.jpg\",\"datePublished\":\"2023-05-06T06:12:00+00:00\",\"dateModified\":\"2023-08-02T09:43:27+00:00\",\"author\":{\"@id\":\"https:\/\/cms.munich-startup.net\/#\/schema\/person\/cab6cd082a88a9e4b2d6ca61a9031a4d\"},\"description\":\"Energyminer entwickelt Mikro-Wasserkraftwerke und hat nun eine Pilotanlage im Auer M\u00fchlbach in M\u00fcnchen in Betrieb genommen.\",\"breadcrumb\":{\"@id\":\"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/#primaryimage\",\"url\":\"https:\/\/cms.munich-startup.net\/wp-content\/uploads\/2023\/03\/Energyminer_Team_Foto-by-Isenhoff_Philip-Herzhoff.jpg\",\"contentUrl\":\"https:\/\/cms.munich-startup.net\/wp-content\/uploads\/2023\/03\/Energyminer_Team_Foto-by-Isenhoff_Philip-Herzhoff.jpg\",\"width\":1920,\"height\":1152,\"caption\":\"Das Gr\u00fcnderteam von Energyminer: Richard Eckl, Chantel Niebuhr und Georg Walder (v. l.)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/cms.munich-startup.net\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Energyminer nimmt Pilotanlage in Betrieb\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/cms.munich-startup.net\/#website\",\"url\":\"https:\/\/cms.munich-startup.net\/\",\"name\":\"Munich Startup\",\"description\":\"Das offizielle Startup-Portal f\u00fcr M\u00fcnchen\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/cms.munich-startup.net\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/cms.munich-startup.net\/#\/schema\/person\/cab6cd082a88a9e4b2d6ca61a9031a4d\",\"name\":\"Simon Tischer\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/cms.munich-startup.net\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0768e5403c34aa0074a7e723cd3a2795?s=96&d=blank&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0768e5403c34aa0074a7e723cd3a2795?s=96&d=blank&r=g\",\"caption\":\"Simon Tischer\"},\"description\":\"Von Dezember 2015 bis Juni 2023 war Simon Tischer als Redakteur f\u00fcr Munich Startup t\u00e4tig.\",\"url\":\"https:\/\/cms.munich-startup.net\/en\/author\/tischer\/\"}]}<\/script>\n<meta property=\"og:image\" content=\"https:\/\/cms.munich-startup.net\/en\/wp-content\/uploads\/2023\/03\/Energyminer_Team_Foto-by-Isenhoff_Philip-Herzhoff.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1152\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Energyminer puts pilot plant into operation - Munich Startup","description":"Energyminer develops micro-hydropower plants and has now commissioned a pilot plant in the Auer M\u00fchlbach stream in Munich.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cms.munich-startup.net\/en\/91081\/energyminer-commissions-pilot-plant\/","og_locale":"en_US","og_type":"article","og_title":"Energyminer nimmt Pilotanlage in Betrieb - Munich Startup","og_description":"Energyminer entwickelt Mikro-Wasserkraftwerke und hat nun eine Pilotanlage im Auer M\u00fchlbach in M\u00fcnchen in Betrieb genommen.","og_url":"https:\/\/cms.munich-startup.net\/en\/91081\/energyminer-commissions-pilot-plant\/","og_site_name":"Munich Startup","article_publisher":"https:\/\/www.facebook.com\/munichstartup\/","article_published_time":"2023-05-06T06:12:00+00:00","article_modified_time":"2023-08-02T09:43:27+00:00","author":"Simon Tischer","twitter_card":"summary_large_image","twitter_creator":"@munich_startup","twitter_site":"@munich_startup","twitter_misc":{"Written by":"Simon Tischer","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/","url":"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/","name":"Energyminer puts pilot plant into operation - Munich Startup","isPartOf":{"@id":"https:\/\/cms.munich-startup.net\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/#primaryimage"},"image":{"@id":"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/#primaryimage"},"thumbnailUrl":"https:\/\/cms.munich-startup.net\/wp-content\/uploads\/2023\/03\/Energyminer_Team_Foto-by-Isenhoff_Philip-Herzhoff.jpg","datePublished":"2023-05-06T06:12:00+00:00","dateModified":"2023-08-02T09:43:27+00:00","author":{"@id":"https:\/\/cms.munich-startup.net\/#\/schema\/person\/cab6cd082a88a9e4b2d6ca61a9031a4d"},"description":"Energyminer develops micro-hydropower plants and has now commissioned a pilot plant in the Auer M\u00fchlbach stream in Munich.","breadcrumb":{"@id":"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/#primaryimage","url":"https:\/\/cms.munich-startup.net\/wp-content\/uploads\/2023\/03\/Energyminer_Team_Foto-by-Isenhoff_Philip-Herzhoff.jpg","contentUrl":"https:\/\/cms.munich-startup.net\/wp-content\/uploads\/2023\/03\/Energyminer_Team_Foto-by-Isenhoff_Philip-Herzhoff.jpg","width":1920,"height":1152,"caption":"Das Gr\u00fcnderteam von Energyminer: Richard Eckl, Chantel Niebuhr und Georg Walder (v. l.)"},{"@type":"BreadcrumbList","@id":"https:\/\/cms.munich-startup.net\/91081\/energyminer-nimmt-pilotanlage-in-betrieb\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cms.munich-startup.net\/"},{"@type":"ListItem","position":2,"name":"Energyminer nimmt Pilotanlage in Betrieb"}]},{"@type":"WebSite","@id":"https:\/\/cms.munich-startup.net\/#website","url":"https:\/\/cms.munich-startup.net\/","name":"Munich Startup","description":"The official startup portal for Munich","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cms.munich-startup.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/cms.munich-startup.net\/#\/schema\/person\/cab6cd082a88a9e4b2d6ca61a9031a4d","name":"Simon Tischer","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cms.munich-startup.net\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0768e5403c34aa0074a7e723cd3a2795?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0768e5403c34aa0074a7e723cd3a2795?s=96&d=blank&r=g","caption":"Simon Tischer"},"description":"From December 2015 to June 2023, Simon Tischer worked as an editor for Munich Startup.","url":"https:\/\/cms.munich-startup.net\/en\/author\/tischer\/"}]},"og_image":[{"width":1920,"height":1152,"url":"https:\/\/cms.munich-startup.net\/wp-content\/uploads\/2023\/03\/Energyminer_Team_Foto-by-Isenhoff_Philip-Herzhoff.jpg","type":"image\/jpeg"}]},"_showyear":"","_inactive":"","_show_financing":"","_hide_on_map":"","_edit_lock":"1690969411:22","_edit_last":"22","_yoast_wpseo_focuskw":"Energyminer","_yoast_wpseo_metadesc":"Energyminer entwickelt Mikro-Wasserkraftwerke und hat nun eine Pilotanlage im Auer M\u00fchlbach in M\u00fcnchen in Betrieb genommen.","_yoast_wpseo_linkdex":"73","_thumbnail_id":"90033","wbounce_status":"default","_yoast_wpseo_primary_category":"5638","_yoast_wpseo_focuskw_text_input":"","_yoast_wpseo_content_score":"30","ms_image_format":"contentwidth","_ms_image_format":"field_5cb8587572c8b","ms_dachzeile":"","_ms_dachzeile":"field_5cd9b7f365df5","ms_bump_post_date":"","_ms_bump_post_date":"field_5d1341edcf42a","guest_author_name":"","_guest_author_name":"field_5cee78a6016f9","guest_author_image":"","_guest_author_image":"field_5cee7914016fb","guest_author_description":"","_guest_author_description":"field_5cee78dd016fa","ms_post_image_caption":"","_ms_post_image_caption":"field_5f735b0735284","ms_post_image_credit":"","_ms_post_image_credit":"field_5f735b1435285","suppress_startupbox":"0","_suppress_startupbox":"field_60a64b0b6efc6","_yoast_wpseo_estimated-reading-time-minutes":"1","_wp_old_date":"","_yoast_wpseo_title":"","_yoast_wpseo_wordproof_timestamp":"","footnotes":"","easy_language_simplification_original_id":"","easy_language_source_language":"","easy_language_simplification_language":"","easy_language_api":"","easy_language_prevent_automatic_mode":"","_wp_old_slug":"","_wp_trash_meta_status":"","_wp_trash_meta_time":"","easy_language_simplification_state_changed_from":"","easy_language_de_EL_changed":"","ms_competition_deadline":"","_ms_competition_deadline":"","_wpbitly":"","enclosure":"","_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","wbounce_template":"","wbounce_title":"","wbounce_text":"","wbounce_cta":"","wbounce_url":"","wbounce_override":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_oembed_7131efca3705e16bd9da2c41df237660":"","_oembed_time_7131efca3705e16bd9da2c41df237660":"","_pprredirect_type":"","_pprredirect_url":"","_yoast_wpseo_opengraph-image":"","_yoast_wpseo_opengraph-image-id":"","_newsletterglue":"","easy_language_text_language":"","_wp_desired_post_slug":"","_relevanssi_noindex_reason":"","_links":{"self":[{"href":"https:\/\/cms.munich-startup.net\/en\/wp-json\/wp\/v2\/posts\/91081"}],"collection":[{"href":"https:\/\/cms.munich-startup.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cms.munich-startup.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cms.munich-startup.net\/en\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/cms.munich-startup.net\/en\/wp-json\/wp\/v2\/comments?post=91081"}],"version-history":[{"count":3,"href":"https:\/\/cms.munich-startup.net\/en\/wp-json\/wp\/v2\/posts\/91081\/revisions"}],"predecessor-version":[{"id":91091,"href":"https:\/\/cms.munich-startup.net\/en\/wp-json\/wp\/v2\/posts\/91081\/revisions\/91091"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cms.munich-startup.net\/en\/wp-json\/wp\/v2\/media\/90033"}],"wp:attachment":[{"href":"https:\/\/cms.munich-startup.net\/en\/wp-json\/wp\/v2\/media?parent=91081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cms.munich-startup.net\/en\/wp-json\/wp\/v2\/categories?post=91081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cms.munich-startup.net\/en\/wp-json\/wp\/v2\/tags?post=91081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}